Home/ Boats/ Westsail Corp. (Usa)/ Westsail 32/ Sails
Sail Specs & Dimensions

Westsail 32 Sails

Sail dimensions, sail area, rig measurements and used sails for sale — Westsail 32 (William Crealock/W. Atkin design).

+ Add to Compare

Rigging Dimensions

The four foretriangle measurements sailmakers need to quote a new suit.

I ?
44.00 ft
J ?
18.30 ft
P ?
38.25 ft
E ?
15.83 ft

Sail Area Breakdown

Calculated from rigging dimensions. Use these as your starting point when ordering a new suit.

SailArea (ft²)Area (m²)
MainsailP × E ÷ 2 302.7 28.1
100% ForetriangleI × J ÷ 2 402.6 37.4
150% GenoaTypical light-air headsail 603.9 56.1
Storm Jib~50% of foretriangle, high-cut 201.3 18.7
Symmetric SpinnakerEstimated from I, J 1,449.4 134.6
Total Working Sail AreaMain + 100% foretriangle 705.3 65.5

Foretriangle Diagram

P 38.3′ E 15.8′ I 44.0′ J 18.3′ Main Foretriangle
Drawn to scale from published I, J, P, E measurements — Cutter · William Crealock/W. Atkin design

Performance Ratios

How the Westsail 32 carries its sail relative to its displacement.

SA/D Ratio
16.7
Moderate — comfortable coastal cruiser, not overcanvassed.
Mast Height (above DWL)
ft
Air draft not published — measure yours before any bridge transit.
Ballast Ratio
36%
Typical cruising ballast — balanced stability underway.

Typical Sail Inventory

What Westsail 32 owners usually carry and what's worth buying used vs. new.

Mainsail 302.7 ft²
Dacron cross-cut with 2 reef points is standard. Full-batten is a common upgrade.
Replace new
150% Genoa 603.9 ft²
The workhorse headsail. Most boats have one on a furler by now.
Replace new
110% Working Jib ~443 ft²
Good secondary sail for breezy days — used market is strong.
Buy used
Storm Jib 201.3 ft²
Bright orange recommended. Rarely used, hard to justify new.
Buy used
Asymmetric Spinnaker ~1,449 ft²
Popular downwind upgrade — easier than symmetric for shorthanded sailing.
Optional

Replacement Cost Estimator

Get a rough price range for a new mainsail and genoa for the Westsail 32 — Dacron, laminate, and cruising performance tiers.

Estimate Cost →