Home/ Boats/ Spindrift/ Spindrift 46/ Sails
Sail Specs & Dimensions

Spindrift 46 Sails

Sail dimensions, sail area and rig measurements — Spindrift 46 (Ron Hillier/D. Peterson (Unauthorized) design).

+ Add to Compare

Rigging Dimensions

The four foretriangle measurements sailmakers need to quote a new suit.

I ?
53.90 ft
J ?
17.80 ft
P ?
49.50 ft
E ?
16.80 ft

Sail Area Breakdown

Calculated from rigging dimensions. Use these as your starting point when ordering a new suit.

SailArea (ft²)Area (m²)
MainsailP × E ÷ 2 415.8 38.6
100% ForetriangleI × J ÷ 2 479.7 44.6
150% GenoaTypical light-air headsail 719.6 66.8
Storm Jib~50% of foretriangle, high-cut 239.9 22.3
Symmetric SpinnakerEstimated from I, J 1,727.0 160.4
Total Working Sail AreaMain + 100% foretriangle 895.5 83.2

Foretriangle Diagram

P 49.5′ E 16.8′ I 53.9′ J 17.8′ Main Foretriangle
Drawn to scale from published I, J, P, E measurements — Cutter · Ron Hillier/D. Peterson (Unauthorized) design

Performance Ratios

How the Spindrift 46 carries its sail relative to its displacement.

SA/D Ratio
14.7
Moderate — comfortable coastal cruiser, not overcanvassed.
Mast Height (above DWL)
ft
Air draft not published — measure yours before any bridge transit.
Ballast Ratio
33%
Typical cruising ballast — balanced stability underway.

Typical Sail Inventory

What Spindrift 46 owners usually carry and what's worth buying used vs. new.

Mainsail 415.8 ft²
Dacron cross-cut with 2 reef points is standard. Full-batten is a common upgrade.
Replace new
150% Genoa 719.6 ft²
The workhorse headsail. Most boats have one on a furler by now.
Replace new
110% Working Jib ~528 ft²
Good secondary sail for breezy days — used market is strong.
Buy used
Storm Jib 239.9 ft²
Bright orange recommended. Rarely used, hard to justify new.
Buy used
Asymmetric Spinnaker ~1,727 ft²
Popular downwind upgrade — easier than symmetric for shorthanded sailing.
Optional

Replacement Cost Estimator

Get a rough price range for a new mainsail and genoa for the Spindrift 46 — Dacron, laminate, and cruising performance tiers.

Estimate Cost →