Home/ Boats/ Ta Chaio Shipbuilding Co. (Taiwan)/ Scorpio 72/ Sails
Sail Specs & Dimensions

Scorpio 72 Sails

Sail dimensions, sail area, rig measurements and used sails for sale — Scorpio 72 (Robert Perry design).

+ Add to Compare

Rigging Dimensions

The four foretriangle measurements sailmakers need to quote a new suit.

I ?
68.00 ft
J ?
27.30 ft
P ?
38.50 ft
E ?
19.25 ft

Sail Area Breakdown

Calculated from rigging dimensions. Use these as your starting point when ordering a new suit.

SailArea (ft²)Area (m²)
MainsailP × E ÷ 2 370.6 34.4
100% ForetriangleI × J ÷ 2 928.2 86.2
150% GenoaTypical light-air headsail 1,392.3 129.3
Storm Jib~50% of foretriangle, high-cut 464.1 43.1
Symmetric SpinnakerEstimated from I, J 3,341.5 310.4
Total Working Sail AreaMain + 100% foretriangle 1,298.8 120.7

Foretriangle Diagram

P 38.5′ E 19.3′ I 68.0′ J 27.3′ Main Foretriangle
Drawn to scale from published I, J, P, E measurements — Staysail Ketch · Robert Perry design

Performance Ratios

How the Scorpio 72 carries its sail relative to its displacement.

SA/D Ratio
10.7
Heavy and modestly canvassed — a comfortable cruiser, not fast.
Mast Height (above DWL)
ft
Air draft not published — measure yours before any bridge transit.
Ballast Ratio
49%
Race-oriented ballast ratio — stiff and powerful.

Typical Sail Inventory

What Scorpio 72 owners usually carry and what's worth buying used vs. new.

Mainsail 370.6 ft²
Dacron cross-cut with 2 reef points is standard. Full-batten is a common upgrade.
Replace new
150% Genoa 1,392.3 ft²
The workhorse headsail. Most boats have one on a furler by now.
Replace new
110% Working Jib ~1,021 ft²
Good secondary sail for breezy days — used market is strong.
Buy used
Storm Jib 464.1 ft²
Bright orange recommended. Rarely used, hard to justify new.
Buy used
Asymmetric Spinnaker ~3,342 ft²
Popular downwind upgrade — easier than symmetric for shorthanded sailing.
Optional

Replacement Cost Estimator

Get a rough price range for a new mainsail and genoa for the Scorpio 72 — Dacron, laminate, and cruising performance tiers.

Estimate Cost →