Home/ Boats/ Ericson Yachts (Usa)/ Ericson 31 Independence/ Sails
Sail Specs & Dimensions

Ericson 31 Independence Sails

Sail dimensions, sail area, rig measurements and used sails for sale — Ericson 31 Independence (Bruce King design).

+ Add to Compare

Rigging Dimensions

The four foretriangle measurements sailmakers need to quote a new suit.

I ?
14.49 ft
J ?
12.92 ft
P ?
ft
E ?
ft

Sail Area Breakdown

Calculated from rigging dimensions. Use these as your starting point when ordering a new suit.

SailArea (ft²)Area (m²)
MainsailP × E ÷ 2
100% ForetriangleI × J ÷ 2 93.6 8.7
150% GenoaTypical light-air headsail 140.4 13.0
Storm Jib~50% of foretriangle, high-cut 46.8 4.3
Symmetric SpinnakerEstimated from I, J 337.0 31.3
Total Working Sail AreaMain + 100% foretriangle

Foretriangle Diagram

Scale diagram unavailable — I, J, P, and E measurements are not all published for the Ericson 31 Independence.

Performance Ratios

How the Ericson 31 Independence carries its sail relative to its displacement.

SA/D Ratio
14.5
Moderate — comfortable coastal cruiser, not overcanvassed.
Mast Height (above DWL)
ft
Air draft not published — measure yours before any bridge transit.
Ballast Ratio
39%
Stiff enough to carry a 150% genoa comfortably into moderate breeze.

Typical Sail Inventory

What Ericson 31 Independence owners usually carry and what's worth buying used vs. new.

Mainsail — ft²
Dacron cross-cut with 2 reef points is standard. Full-batten is a common upgrade.
Replace new
150% Genoa 140.4 ft²
The workhorse headsail. Most boats have one on a furler by now.
Replace new
110% Working Jib ~103 ft²
Good secondary sail for breezy days — used market is strong.
Buy used
Storm Jib 46.8 ft²
Bright orange recommended. Rarely used, hard to justify new.
Buy used
Asymmetric Spinnaker ~337 ft²
Popular downwind upgrade — easier than symmetric for shorthanded sailing.
Optional

Replacement Cost Estimator

Get a rough price range for a new mainsail and genoa for the Ericson 31 Independence — Dacron, laminate, and cruising performance tiers.

Estimate Cost →