Home/ Boats/ Columbia Sailing Yachts (Usa)/ Columbia 43/ Sails
Sail Specs & Dimensions

Columbia 43 Sails

Sail dimensions, sail area, rig measurements and used sails for sale — Columbia 43 (William Tripp Jr. design).

+ Add to Compare

Rigging Dimensions

The four foretriangle measurements sailmakers need to quote a new suit.

I ?
53.00 ft
J ?
17.67 ft
P ?
45.00 ft
E ?
15.00 ft

Sail Area Breakdown

Calculated from rigging dimensions. Use these as your starting point when ordering a new suit.

SailArea (ft²)Area (m²)
MainsailP × E ÷ 2 337.5 31.4
100% ForetriangleI × J ÷ 2 468.3 43.5
150% GenoaTypical light-air headsail 702.4 65.3
Storm Jib~50% of foretriangle, high-cut 234.1 21.8
Symmetric SpinnakerEstimated from I, J 1,685.7 156.6
Total Working Sail AreaMain + 100% foretriangle 805.8 74.9

Foretriangle Diagram

P 45.0′ E 15.0′ I 53.0′ J 17.7′ Main Foretriangle
Drawn to scale from published I, J, P, E measurements — Masthead Sloop · William Tripp Jr. design

Performance Ratios

How the Columbia 43 carries its sail relative to its displacement.

SA/D Ratio
18.2
Powerful cruiser/racer — quick in light air, reef early in a blow.
Mast Height (above DWL)
ft
Air draft not published — measure yours before any bridge transit.
Ballast Ratio
50%
Race-oriented ballast ratio — stiff and powerful.

Typical Sail Inventory

What Columbia 43 owners usually carry and what's worth buying used vs. new.

Mainsail 337.5 ft²
Dacron cross-cut with 2 reef points is standard. Full-batten is a common upgrade.
Replace new
150% Genoa 702.4 ft²
The workhorse headsail. Most boats have one on a furler by now.
Replace new
110% Working Jib ~515 ft²
Good secondary sail for breezy days — used market is strong.
Buy used
Storm Jib 234.1 ft²
Bright orange recommended. Rarely used, hard to justify new.
Buy used
Asymmetric Spinnaker ~1,686 ft²
Popular downwind upgrade — easier than symmetric for shorthanded sailing.
Optional

Replacement Cost Estimator

Get a rough price range for a new mainsail and genoa for the Columbia 43 — Dacron, laminate, and cruising performance tiers.

Estimate Cost →