Home/ Boats/ Cooper Yachts/ Banner 37/ Sails
Sail Specs & Dimensions

Banner 37 Sails

Sail dimensions, sail area, rig measurements and used sails for sale — Banner 37 (Stan Huntingford design).

+ Add to Compare

Rigging Dimensions

The four foretriangle measurements sailmakers need to quote a new suit.

I ?
47.50 ft
J ?
16.00 ft
P ?
42.00 ft
E ?
13.00 ft

Sail Area Breakdown

Calculated from rigging dimensions. Use these as your starting point when ordering a new suit.

SailArea (ft²)Area (m²)
MainsailP × E ÷ 2 273.0 25.4
100% ForetriangleI × J ÷ 2 380.0 35.3
150% GenoaTypical light-air headsail 570.0 53.0
Storm Jib~50% of foretriangle, high-cut 190.0 17.7
Symmetric SpinnakerEstimated from I, J 1,368.0 127.1
Total Working Sail AreaMain + 100% foretriangle 653.0 60.7

Foretriangle Diagram

P 42.0′ E 13.0′ I 47.5′ J 16.0′ Main Foretriangle
Drawn to scale from published I, J, P, E measurements — Masthead Sloop · Stan Huntingford design

Performance Ratios

How the Banner 37 carries its sail relative to its displacement.

SA/D Ratio
18.5
Powerful cruiser/racer — quick in light air, reef early in a blow.
Mast Height (above DWL)
ft
Air draft not published — measure yours before any bridge transit.
Ballast Ratio
41%
Stiff enough to carry a 150% genoa comfortably into moderate breeze.

Typical Sail Inventory

What Banner 37 owners usually carry and what's worth buying used vs. new.

Mainsail 273.0 ft²
Dacron cross-cut with 2 reef points is standard. Full-batten is a common upgrade.
Replace new
150% Genoa 570.0 ft²
The workhorse headsail. Most boats have one on a furler by now.
Replace new
110% Working Jib ~418 ft²
Good secondary sail for breezy days — used market is strong.
Buy used
Storm Jib 190.0 ft²
Bright orange recommended. Rarely used, hard to justify new.
Buy used
Asymmetric Spinnaker ~1,368 ft²
Popular downwind upgrade — easier than symmetric for shorthanded sailing.
Optional

Replacement Cost Estimator

Get a rough price range for a new mainsail and genoa for the Banner 37 — Dacron, laminate, and cruising performance tiers.

Estimate Cost →